Equipment Physical Design Standards ATT-TP-76200, Issue 19
AT&T Services, Inc. June 2014
AT&T Services Documentation Package Evaluation Process
The AT&T Services Common Systems Equipment Evaluation group will review the
equipment Documentation Package. If the equipment cannot be evaluated as compliant
to all applicable requirements, an Initial Letter will be sent to the company representative
specifying the areas that are not evaluated in conformance and what further action is
required of the equipment supplier.
Upon receipt of the Initial Letter, the equipment supplier may forward supplemental data
to or contact the company representative, the AT&T Services Equipment Evaluation
Group Coordinator or a specific SME regarding non-compliance resolution. Contact
information for the Group Coordinator and SMEs is contained in the Initial Letter.
Documentation, electronic, forwarded to AT&T Services containing supplemental data in
response to an Initial Letter should identify the contents of documentation and reference
the Evaluation Log number assigned to the product, the SME who requested the data
and the non-compliance requirement the data is addressing.
The SME(s) who requested the documentation will evaluate supplemental data forwarded
to AT&T Services by the product supplier. If the supplemental data is sufficient to allow
all open areas to be evaluated as in conformance to applicable requirements, a
Notification of Conformance to ATT-TP76200 Report will be sent to the company
representative notifying them that the equipment conforms to requirements. If there are
still open items after supplemental data has been reviewed an Evaluation Status letter
will be sent to the company representative giving the status of the product and what
further action the product supplier needs to take.
AT&T Services Product Evaluation Fast Track Process
AT&T Services has established a fast track process it will use for certain business
opportunities to streamline equipment evaluations and shorten time-to-market intervals.
The process consists of AT&T Services accepting ATT-TP-76200 compliance Letters of
Attestation and minimal product information from equipment suppliers in lieu of the Test
Report Documentation Package described above.
A. ATT-TP-76200 Fast Track General guidelines:
1) The process is an optionally agreed upon business arrangement between AT&T
Services and an equipment supplier.
2) A supplier must have successfully participated in the Test Report Documentation
Package process at least once to be eligible for the fast track process.
3) AT&T Services reserves the right to review any and all test documentation cited in
the Letter of Attestation during the time the equipment is an integral component of
AT&T’s network.
4) Test documentation cited in the Letter of Attestation must be made available to
AT&T Services within 20 business days upon receipt of a written request.