
Equipment Physical Design Standards ATT-TP-76200, Issue 19
AT&T Services, Inc. June 2014
14. Outside Plant/Cell Site Deployment Configurations and Enclosures
Deployment Configurations
The configuration of equipment deployed in OSP/CELL-SITE cabinets shall be approved
by OSP/CELL-SITE staff prior to approval. OSP/CELL-SITE contact:
Jason Neal
2600 Camino Ramon
San Ramon CA, 94583Phone: (925)823-2736
e-mail: jn6729@Att.com
OSP/CELL-SITE Enclosure
Reference the ATT-TP-76205 AT&T Electronic Equipment Enclosure / Cabinet
(EEE/C) Standard for applicable requirement and process..
( https://ebiznet.sbc.com/sbcnebs/
)
This section does not cover Huts and CEVs. For verification of test requirements for
OSP/CELL-SITE cabinets and other enclosures contact Jason Neal at (925) 823-2736.
15. Equipment Information Form Description
General
This section includes equipment information forms to help suppliers communicate
equipment information in a way that will facilitate the equipment evaluation process. These
equipment information forms may be reproduced as necessary. The equipment information
forms shall be completed and provided for new equipment and for enhanced equipment
already approved for use in AT&T.
ESR Form Description
The ESR Equipment Supplier Requirements Checklist forms are provided so equipment
suppliers can have a checklist of requirements for each level of conformance.
An ESR form is no longer required for AT&T TP-76200 Evaluation as part of the
documentation package.
ESP Form Description
The engineering and space planning forms provide a detailed overview of the planning
and engineering considerations associated with products being evaluated. System
Copyright ©2014, AT&T . All Rights Reserved.
46
Comentarios a estos manuales