
Equipment Physical Design Standards ATT-TP-76200, Issue 19
AT&T Services, Inc. June 2014
i. Manufacturer shall enter the respective airflow path(s) in the space
provided adjacent to the Yes or No indicator on Form ESP-001/2.
ii. Where more than one path exists, separate each path with a comma (e.g.,
F1-R3, F2-R3).
iii. Other cooling methods shall be explained with a statement included as
attachment to Form ESP-001/002.
Figure 6.4 - ESP – Path Designations
c. ESP Form - Non-Standard Airflow Path Reporting
Equipment cooling airflow designs other than front to rear/top (or BXT for
OSP) are considered non-preferred (e.g., side flow, etc.).
i. Equipment with non-preferred air flow path(s) will no longer be considered
for approval unless submitted with an integrated / attached air flow
redirection solution which effectively adjusts the air flow to the standard
front to rear requirement.
ii. Equipment with non-preferred air flow path(s) will be considered by ATT
Services; however non-preferred flow equipment will be considered on a
case by case basis and will require deployment restrictions or equipment
revisions prior to deployment.
Specifically, side to side air flow (e.g., SR2-SL2, etc.) and bottom to top
airflow (e.g., B-T) (Equipment for Mobility remote offices accepted) shall
require air deflection units as part of the equipment deployment to affect
the change of air flow to front to rear.)
2. ATIS Table 2 Airflow Reporting - General
The ATIS Table 2 Airflow Measurements source information is found in the
same ATIS document (ATIS- 0600010.03.2011 Heat Dissipation
Requirements for Network Telecommunications Equipment) described in
Section 6.4.E above.
Copyright ©2014, AT&T . All Rights Reserved.
29
Comentarios a estos manuales