
Equipment Physical Design Standards ATT-TP-76200, Issue 19
AT&T Services, Inc. June 2014
ESR-003-OSP/CELL-SITE (Level 3)
Outside Plant/Cell Site Level 3
ATT-TP-76200 Requirements for Electronic Equipment Deployed in Outside Plant
Manufacturer:___________________ Product Name:_______________________ Date:___________
CLASS 2 & 3 & 4
1
OSP/CELL-SITE ELECTRICAL COMPONENT REQUIREMENTS
2
2 Electromagnetic Compatibility/Electrical Safety
4 Electrostatic Discharge & Fast Transient
GR-63 R4-100,
Section 4.5.1.1
6.2Temperature and Humidity (pick applicable rqmt)
Field Vibration,
OSP/CELL-SITE
12 Physical Design and Manufacturing
OSP/CELL-SITE ENCLOSURES See ATT-TP-76200 Section 14
1. Equipment must conform to requirements applicable to Class of Environment intended for deployment
2. Equipment intended for deployment in both CO and OSP/CELL-SITE locations must be compliant to both Level 3 CO & OSP/CELL-SITE
requirements
3. Use appropriate ESP form to report this information.
NOTE: The configuration of equipment deployed in OSP/CELL-SITE cabinets must be approved by OSP/CELL-SITE staff prior to approval for
use. See paragraph 14.1 of this document.
4. Communication Equipment Placed at Customer Prem Requires LISTING
Copyright ©2014, AT&T . All Rights Reserved.
58
Comentarios a estos manuales